Building management systems
Field devices, DDC and IO panels, valve and damper actuation, BACnet and Modbus integration, graphics, alarm and trend configuration, and integration of HVAC, electrical and fire systems into one head-end.
We integrate BMS and execute environmental control systems for metro stations, depots and tunnels — and the full air-side and water-side scope for commercial and industrial projects. Headquartered in Noida, working on sites across India.
Each stream is delivered as a complete package — selection, supply, installation, testing and documentation — or as labour-and-supervision against your supply.
Field devices, DDC and IO panels, valve and damper actuation, BACnet and Modbus integration, graphics, alarm and trend configuration, and integration of HVAC, electrical and fire systems into one head-end.
Environmental control for underground and elevated stations, tunnel ventilation interfaces, depot and workshop systems, technical rooms and station control rooms — executed to rail-sector documentation and safety discipline.
Basement and car park ventilation, staircase pressurisation, smoke extract, commercial kitchen exhaust, industrial extract and fresh air treatment units.
Air- and water-cooled chilled water systems: plant room layout, primary and secondary pumping, headers, cooling towers, valving and insulation.
VRF and VRV systems, ductable splits, AHUs and FCUs, precision units for server and signalling equipment rooms — sized off heat load calculations, not rules of thumb.
GI ducting fabricated and erected to SMACNA gauges and sealing class, with supports, dampers, grilles, diffusers and thermal or acoustic insulation.
Controlled environments for pharma, electronics and healthcare: HEPA terminal filtration, pressure cascade, panelling interface and validation support.
Comprehensive and non-comprehensive maintenance contracts — scheduled servicing, breakdown response, spares, BMS trend review and periodic performance logging.
Six stages, each closing with a document you can file against the contract. No stage starts before the previous one is signed off.
Site measurement, occupancy and envelope data, block and room-wise heat load, points list for BMS.
Equipment selection, duct and pipe sizing, control philosophy, GA drawings, item-wise bill of quantities.
Coordinated services routing, panel and wiring schematics, hanger details, consultant approval.
Ducting and panels built to approved specification, inspection at source, staged delivery to site.
Supervised erection to programme, cabling and termination, daily manpower reporting, safety compliance.
Pressure testing, air and water balancing, point-to-point BMS checks, O&M manuals, as-builts, AMC start.
Main contractors carry the risk of a subcontractor who cannot produce paperwork at handover — and on metro and public infrastructure packages that paperwork is audited. Every package we quote includes the full document set, priced in, not raised as a variation later.
Client references, completion certificates and registration documents are issued on request against a specific tender.
| Deliverable | Stage issued |
|---|---|
| Heat load calculation sheets | Design |
| Equipment selection & technical data sheets | Design |
| BMS points list & control philosophy | Design |
| Item-wise bill of quantities | Tender |
| GA and coordinated shop drawings | Pre-installation |
| Panel wiring schematics | Pre-installation |
| Material inspection & test certificates | Supply |
| Duct leakage & pipe pressure test reports | Testing |
| Air and water balancing report | Commissioning |
| BMS point-to-point checklist | Commissioning |
| O&M manuals and spares list | Handover |
| As-built drawings | Handover |
Share the tender BOQ, drawing set or a description of the site. We respond to enquiries within one working day, anywhere in India.